Faber room-sealed built-in gas-fireplace FEELING User Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 29
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
UK/IRL
23
UK/IRL
22
4.4 Preparing the appliances Spectra Nova/Cadra Nova (continuing)
4. Take the box with the log set out of the combustion chamber.
5. Place the right flue restrictor in the combustion chamber. To
determine the right flue restrictor, see chapter 3.
fig. 15
4.4 Preparing the appliances Spectra Nova/Cadra Nova
1. To open the door, remove the screws A (see fig. 13). Open and
remove the door; lift and pull forward. Be sure that there are no
fingerprints on the glass. It is not possible to remove those prints
after you burn the appliance for a while (they are burnt in).
2. Remove the back panel by loosening the 4 screws B (see fig. 14).
fig. 13
fig. 14
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 28 29

Comments to this Manuals

No comments